Autumn Morning in Tsukahara

Autumn Morning in Tsukahara
Autumn morning in Tsukahara

Friday, November 14, 2014

Rebar




Installation of the rebar has begun. Holes were drilled in the foundation and rebar was used to attach the new foundation to the original structure.
 
 
The contractor was able to accurately mark the positioning of the rebar thanks to the application of “trash concrete” (see previous post). Clever engineering as the rebar never rests on the soil. Up next: Completion of the rebar installation in preparation for concrete.   George




 

No comments:

Post a Comment