It’s a great time to do tiling since it has been raining everyday. I decided to give a general idea about how we do tiling. Basically, the floor is done first. Next, the trim is installed. I cut a slot in each trim piece (thickness of the tile plus adhesive) which is used to help support the wall trim. The first row of tile is installed. Tape is used to temporarily hold the tile upright. I leave the tile adhesive to cure overnight. This prevents the tiles from sagging under their own weight.











The next day, I remove the tape and install the next row. Again, I wait for the adhesive to cure overnight. The cabinet is temporarily installed and will be removed for the plumbing. The brackets are for an extended cabinet top which will be installed and tiled after the cabinet is permanently installed. The toilet paper holder will attach to the cabinet top. This is a common installation in Japan, but with a touch of Americana added for good measure.











I continue this process until the project is complete.







Next, I grout and seal the tiles.





Finally, the upper trim piece is installed. Again, I cut a slot in the trim to help support the tile and to give the wall a finished look.









Last, but not least, a second coat of paint is applied. This bathroom is ready for a toilet and sink to be installed. The black trim tiles were cut from leftover tile from the front entry. Stay tuned...




The guest bedroom floor is complete and the walls are being primed for paint. Lots to do before the rainy season is done. The laminate flooring (pictured in the middle and purchased in the U.S. almost eight years ago) will be installed in the hallway as soon as the guest bedroom is complete. I'm tired just thinking about it...