The dining room is finished.
Over 150 tiles were installed and it sure felt like it. My knees and back were sore for a week.
After the tiles were
installed, the logs were repaired, stained to match the existing logs,
and clear coated. This step was time consuming. Once that was done it was time to patch, prime, and paint the
walls. I needed to hurry as the Christmas party deadline was quickly
approaching.
The moulding around the windows was added after the paint. The dining room was completed just in time for the party.
I wanted to thank everyone for sharing Christmas
with us. We had a lot of good food and English conversation. Sorry we didn't have any snow! George
No comments:
Post a Comment